Pre-project work
- Engineering survey
- Development of feasibility studies for construction
- Development of off-stage works “Power plant power distribution scheme”, including coordination with energy transmission companies and the system operator of the Republic of Kazakhstan – KEGOC JSC
- Development of off-stage works “Scheme of external power supply to the consumer”, including coordination with energy transmission companies and the system operator of the Republic of Kazakhstan - KEGOC JSC
- Calculation of modes of electrical networks up to 500 kV