KZ RU EN
48/1 Toraighyrov St, Pavlodar city, Republic of Kazakhstan
KZ RU EN
48/1 Toraighyrov St, Pavlodar city, Republic of Kazakhstan
The Project
  • The Project
  • Ekibastuz GRES-1
  • KEGOC JSC
  • Vostochnyi open-pit mine Eurasian Energy Corporation JSC
  • ES JSC "Eurasian Energy Corporation"
  • Zhezkazgan TPP, Kazakhmys Corporation LLP
  • Ekibastuz GRES-2 Station JSC
  • Alga A JSC
  • Aktobe Ferroalloy Plant – branch of JSC "TNK "Kazchrome"
  • Kazakhmys Smelting LLP
  • Shubarkol Komir JSC
  • Ust-Kamenogorsk CHPP
  • Karaganda BI Energy Plus LLP
  • Shulbinskaya HPP
  • Aksu Ferroalloy Plant – branch of Transnational company Kazchrome JSC
  • Prommashkomplekt LLP
  • Kazakhmys Energy LLP
  • Energo Spets Stroy LLP
  • Aluminum of Kazakhstan JSC
  • Nitro Sibir Kazakhstan LLP
  • KazTransCom JSC
  • Don Ore-Dressing Plant - branch of TNC Kazchrome JSC
  • KAZ Minerals Bozshakol LLP
  • Bukhtarma Hydropower Complex
  • Pavlodar-Soda LLP
  • Atyrau Oil Refinery LLP
  • Altyn Group LLP
  • TechnoGroupService LLP
  • PP Solutions LLP
  • Kaz Green Energy LLP
  • Ekibastuzteploenergo LLP
  • Pavlodar-Soda LLP
  • Keregetas mine of Aluminum of Kazakhstan JSC
  • STEC-3 3-Energoortalyk JSC
  • Zhezkazgan Plant of Metal Structures LLP
  • Bogatyr Komir LLP
  • KSP Steel LLP
  • Copper Company Konrad LLP
  • Technogruppservice LLP
  • Shymkent Thermal Power Plant-3 JSC 3-Energoortalyk
Name Customer Type of project Year Note
81

Development of a working project “Power Supply. Construction of off-site networks and facilities for a soda ash plant with a capacity of 200 thousand tons per year”

Pavlodar-Soda LLP

Energy project

2018

The positive conclusion of the comprehensive non-departmental examination by Gosexpertiza RSE was received.

82

Checking and calculating the settings of relay protection and automation equipment of the auxiliary network of the VII stage of the Ust-Kamenogorsk TPP

Energometroservice LLP

Energy project

2018

83

Designing a system for collecting operational data from the main feeding center to automated dispatch control system

TNC Kazchrome JSC

Energy project

2018-2019

84

Development of working documentation for modernization “Installation of WARMAN reserve pumps at the flotation and thickening section of the BODP Sulphide Ore Processing Plant”

KAZ Minerals Bozshakol LLP

Technological project

2018-2019

85

Development of a working project “Reconstruction of industrial downpour sewage at the coke chemical shop site” Shubarkol Komir JSC

Shubarkol Komir JSC

Technological project

2017