The Project
  • The Project
  • Ekibastuz GRES-1
  • KEGOC JSC
  • Vostochnyi open-pit mine Eurasian Energy Corporation JSC
  • ES JSC "Eurasian Energy Corporation"
  • Zhezkazgan TPP, Kazakhmys Corporation LLP
  • Ekibastuz GRES-2 Station JSC
  • Alga A JSC
  • Aktobe Ferroalloy Plant – branch of JSC "TNK "Kazchrome"
  • Kazakhmys Smelting LLP
  • Shubarkol Komir JSC
  • Ust-Kamenogorsk CHPP
  • Karaganda BI Energy Plus LLP
  • Shulbinskaya HPP
  • Aksu Ferroalloy Plant – branch of Transnational company Kazchrome JSC
  • Prommashkomplekt LLP
  • Kazakhmys Energy LLP
  • Energo Spets Stroy LLP
  • Aluminum of Kazakhstan JSC
  • Nitro Sibir Kazakhstan LLP
  • KazTransCom JSC
  • Don Ore-Dressing Plant - branch of TNC Kazchrome JSC
  • KAZ Minerals Bozshakol LLP
  • Bukhtarma Hydropower Complex
  • Pavlodar-Soda LLP
  • Atyrau Oil Refinery LLP
  • Altyn Group LLP
  • TechnoGroupService LLP
  • PP Solutions LLP
  • Kaz Green Energy LLP
  • Ekibastuzteploenergo LLP
  • Pavlodar-Soda LLP
  • Keregetas mine of Aluminum of Kazakhstan JSC
  • STEC-3 3-Energoortalyk JSC
  • Zhezkazgan Plant of Metal Structures LLP
  • Bogatyr Komir LLP
  • KSP Steel LLP
  • Copper Company Konrad LLP
  • Technogruppservice LLP
  • Shymkent Thermal Power Plant-3 JSC 3-Energoortalyk
Name Customer Type of project Year Note
196

Development of a project for the installation of a bag filter of the FABPAC type by ALSTOM as a dust collection system on belt conveyors within the power unit of st. No. 5 on LK 45B, LK 46 A

Ekibastuz GRES-1 LLP

Technological project

2009-2010

The facility was commissioned according to the project

197

Development of the project “System for the automatic loading of raw coal bunkers in the boiler unit of st. No. 8”

Ekibastuz GRES-1 LLP

Energy project

2009-2010

The facility was commissioned according to the project

198

Development of a project for an automatic fire extinguishing system within the power unit of st. No. 8 in the galleries LK 48A, LK 48B

Ekibastuz GRES-1 LLP

Technological project

2009-2010

The facility was commissioned according to the project

199

Development of a project for a device for eliminating freezing of fuel in raw coal bunkers in the boiler unit at power unit st. No. 8

Ekibastuz GRES-1 LLP

Technological project

2009-2010

The facility was commissioned according to the project

200

Development of a project for the installation of an automatic weighing system for the fuel flow entering the RCB with the installation of balance on the LC 48A, LC 48B

Ekibastuz GRES-1 LLP

Energy project

2009-2010

The facility was commissioned according to the project

Download reference list