- The Project
- Ekibastuz GRES-1
- KEGOC JSC
- Vostochnyi open-pit mine Eurasian Energy Corporation JSC
- ES JSC "Eurasian Energy Corporation"
- Zhezkazgan TPP, Kazakhmys Corporation LLP
- Ekibastuz GRES-2 Station JSC
- Alga A JSC
- Aktobe Ferroalloy Plant – branch of JSC "TNK "Kazchrome"
- Kazakhmys Smelting LLP
- Shubarkol Komir JSC
- Ust-Kamenogorsk CHPP
- Karaganda BI Energy Plus LLP
- Shulbinskaya HPP
- Aksu Ferroalloy Plant – branch of Transnational company Kazchrome JSC
- Prommashkomplekt LLP
- Kazakhmys Energy LLP
- Energo Spets Stroy LLP
- Aluminum of Kazakhstan JSC
- Nitro Sibir Kazakhstan LLP
- KazTransCom JSC
- Don Ore-Dressing Plant - branch of TNC Kazchrome JSC
- KAZ Minerals Bozshakol LLP
- Bukhtarma Hydropower Complex
- Pavlodar-Soda LLP
- Atyrau Oil Refinery LLP
- Altyn Group LLP
- TechnoGroupService LLP
- PP Solutions LLP
- Kaz Green Energy LLP
- Ekibastuzteploenergo LLP
- Pavlodar-Soda LLP
- Keregetas mine of Aluminum of Kazakhstan JSC
- STEC-3 3-Energoortalyk JSC
- Zhezkazgan Plant of Metal Structures LLP
- Bogatyr Komir LLP
- KSP Steel LLP
- Copper Company Konrad LLP
- Technogruppservice LLP
- Shymkent Thermal Power Plant-3 JSC 3-Energoortalyk
№ | Name | Customer | Type of project | Year | Note |
196 |
Development of a project for the installation of a bag filter of the FABPAC type by ALSTOM as a dust collection system on belt conveyors within the power unit of st. No. 5 on LK 45B, LK 46 A |
Ekibastuz GRES-1 LLP |
Technological project |
2009-2010 |
The facility was commissioned according to the project |
197 |
Development of the project “System for the automatic loading of raw coal bunkers in the boiler unit of st. No. 8” |
Ekibastuz GRES-1 LLP |
Energy project |
2009-2010 |
The facility was commissioned according to the project |
198 |
Development of a project for an automatic fire extinguishing system within the power unit of st. No. 8 in the galleries LK 48A, LK 48B |
Ekibastuz GRES-1 LLP |
Technological project |
2009-2010 |
The facility was commissioned according to the project |
199 |
Development of a project for a device for eliminating freezing of fuel in raw coal bunkers in the boiler unit at power unit st. No. 8 |
Ekibastuz GRES-1 LLP |
Technological project |
2009-2010 |
The facility was commissioned according to the project |
200 |
Development of a project for the installation of an automatic weighing system for the fuel flow entering the RCB with the installation of balance on the LC 48A, LC 48B |
Ekibastuz GRES-1 LLP |
Energy project |
2009-2010 |
The facility was commissioned according to the project |