- Customer
- Ekibastuz GRES-1 LLP
- Sibtechenergo OJSC
- Ekibastuz-energoremont LLP
- Karaganda BI Energy Plus LLP
- Kazakhmys Corporation LLP
- TekhProject LLP
- Promyshlennaya Gazoochistka Kazakhstana LLP
- Eurasian Energy Corporation JSC
- Karaganda BI Energy LLP
- KAZPROMPRIBOR LLP
- Alga A JSC
- Kazenergonaladka Firm LLP
- Aktobe HPP JSC
- Sary-Arka Spetskoks LLP
- SPACE-MOTOR CJSC
- AES Ust-Kamenogorsk HPP LLP
- STROYINDUSTRIYA LLP
- AES Shulba Hydroelectric Power Station LLP
- Nur Stroy Pavlodar LLP
- Firma Partner Plus LLP
- Energo Spets Stroy LLP
- Aluminum of Kazakhstan JSC
- Nitro Sibir Kazakhstan LLP
- KazTransCom JSC
- Shubarkol Komir JSC
- KAZ Minerals Bozshakol LLP
- SEVKAZENERGOPROM RESEARCH AND PRODUCTION COMPANY LLP
- Kazzinc LLP
- TNC Kazchrome JSC
- Kazpromcontrol LLP
- Pavlodar-Soda LLP
- Energometroservice LLP
- Altyn Group LLP
- TechnoGroupService LLP
- EKRA KAZAKHSTAN LLP
- Kazakhstan Aluminium Smelter JSC
- Atyrau Oil Refinery LLP
- Ust-Kamenogorsk TPP LLP
№ | Name | The objects | Type of project | Year | Note |
6 |
Pavlodar Aluminum Plant. Aluminum of Kazakhstan JSC, EEC. Overhaul of the outdoor lighting system of the PAP territory |
Aluminum of Kazakhstan JSC |
Energy project |
2019 |
|
7 |
Calculation of the electric network modes for 220 kV overhead lines No. 2418, 2328 when connecting a 50 MW SES with justification for the possibility of its connection |
Kaz Green Energy LLP |
Pre-project work/Renewable energy source |
2019 |
|
8 |
Development of the working project “Aluminum of Kazakhstan JSC, Pavlodar Aluminum Plant. The device ASKUE LMC and integration in Electricity Commercial Metering Automated System PAP” |
Aluminum of Kazakhstan JSC |
Energy project |
2019 |
|
9 |
External power supply for open pit No. 2 of the VAM mine of bauxite. Substation 35/6 kV - 2x 4000 kVA, VL-35 kV.Kostanay region, Taranov district, Lissakovsk, Branch of Aluminum of Kazakhstan |
Branch of Aluminum of Kazakhstan JSC Krasnooktyabrsk bauxite ore department |
Energy project |
2019 |
|
10 |
Work on the development of the project (“Project” stage) “Transfer and equipping the central control room”, PP of EEC JSC |
PP of Eurasian Energy Corporation JSC |
Energy project |
2019 |
|
