KZ RU EN
48/1 Toraighyrov St, Pavlodar city, Republic of Kazakhstan
KZ RU EN
48/1 Toraighyrov St, Pavlodar city, Republic of Kazakhstan
The Project
  • The Project
  • Ekibastuz GRES-1
  • KEGOC JSC
  • Vostochnyi open-pit mine Eurasian Energy Corporation JSC
  • ES JSC "Eurasian Energy Corporation"
  • Zhezkazgan TPP, Kazakhmys Corporation LLP
  • Ekibastuz GRES-2 Station JSC
  • Alga A JSC
  • Aktobe Ferroalloy Plant – branch of JSC "TNK "Kazchrome"
  • Kazakhmys Smelting LLP
  • Shubarkol Komir JSC
  • Ust-Kamenogorsk CHPP
  • Karaganda BI Energy Plus LLP
  • Shulbinskaya HPP
  • Aksu Ferroalloy Plant – branch of Transnational company Kazchrome JSC
  • Prommashkomplekt LLP
  • Kazakhmys Energy LLP
  • Energo Spets Stroy LLP
  • Aluminum of Kazakhstan JSC
  • Nitro Sibir Kazakhstan LLP
  • KazTransCom JSC
  • Don Ore-Dressing Plant - branch of TNC Kazchrome JSC
  • KAZ Minerals Bozshakol LLP
  • Bukhtarma Hydropower Complex
  • Pavlodar-Soda LLP
  • Atyrau Oil Refinery LLP
  • Altyn Group LLP
  • TechnoGroupService LLP
  • PP Solutions LLP
  • Kaz Green Energy LLP
  • Ekibastuzteploenergo LLP
  • Pavlodar-Soda LLP
  • Keregetas mine of Aluminum of Kazakhstan JSC
  • STEC-3 3-Energoortalyk JSC
  • Zhezkazgan Plant of Metal Structures LLP
  • Bogatyr Komir LLP
  • KSP Steel LLP
  • Copper Company Konrad LLP
  • Technogruppservice LLP
  • Shymkent Thermal Power Plant-3 JSC 3-Energoortalyk
Name Customer Type of project Year Note
146

Development of a project for the replacement of a 3T transformer of Bulat Nurzhanov Ekibastuz GRES-1 LLP

Karaganda BI Energy Plus LLP

Energy project

2013

The facility was commissioned according to the project

147

Reconstruction of suction units for fuel supply of AES Ust-Kamenogorsk TPP LLP

AES Ust-Kamenogorsk HPP LLP

Technological project

2013

The facility was commissioned according to the project

148

Work on the preparation of a project for the treatment (disinfection) of household waste in Bulat Nurzhanov Ekibastuz GRES-1 LLP

Karaganda BI Energy Plus LLP

Technological project

2013

149

Development of design documentation for strengthening the floor beam of block pumping station No. 2

Karaganda BI Energy Plus LLP

Architectural and construction project

2013

The facility was commissioned according to the project

150

Development of design documentation for reinforcing the structure of a fireproof wall in the substation unit No. 3

Karaganda BI Energy Plus LLP

Architectural and construction project

2013

The facility was commissioned according to the project

Download reference list