- Customer
- Ekibastuz GRES-1 LLP
- Sibtechenergo OJSC
- Ekibastuz-energoremont LLP
- Karaganda BI Energy Plus LLP
- Kazakhmys Corporation LLP
- TekhProject LLP
- Promyshlennaya Gazoochistka Kazakhstana LLP
- Eurasian Energy Corporation JSC
- Karaganda BI Energy LLP
- KAZPROMPRIBOR LLP
- Alga A JSC
- Kazenergonaladka Firm LLP
- Aktobe HPP JSC
- Sary-Arka Spetskoks LLP
- SPACE-MOTOR CJSC
- AES Ust-Kamenogorsk HPP LLP
- STROYINDUSTRIYA LLP
- AES Shulba Hydroelectric Power Station LLP
- Nur Stroy Pavlodar LLP
- Firma Partner Plus LLP
- Energo Spets Stroy LLP
- Aluminum of Kazakhstan JSC
- Nitro Sibir Kazakhstan LLP
- KazTransCom JSC
- Shubarkol Komir JSC
- KAZ Minerals Bozshakol LLP
- SEVKAZENERGOPROM RESEARCH AND PRODUCTION COMPANY LLP
- Kazzinc LLP
- TNC Kazchrome JSC
- Kazpromcontrol LLP
- Pavlodar-Soda LLP
- Energometroservice LLP
- Altyn Group LLP
- TechnoGroupService LLP
- EKRA KAZAKHSTAN LLP
- Kazakhstan Aluminium Smelter JSC
- Atyrau Oil Refinery LLP
- Ust-Kamenogorsk TPP LLP
№ | Name | The objects | Type of project | Year | Note |
56 |
Reconstruction of the supply and exhaust ventilation system of the Environment Protection and Industrial Sanitation Laboratory building (inv. No. 159), DGOK, Khromtau, TNC Kazchrome JSC |
Don Mining and Processing Plant |
Technological project |
2016 |
Received a positive conclusion from a comprehensive non-departmental examination. |
57 |
Installation of satellite communication antenna and diesel generator at the communication center of Pavlodar, industrial site of KazTransCom JSC in the Northern industrial zone |
KazTransCom JSC |
Energy project |
2016 |
Received a positive conclusion from a comprehensive non-departmental examination. The facility was commissioned according to the project. |
58 |
Reconstruction of outdoor switchgear-2 110kV, AES Ust-Kamenogorsk TPP LLP |
AES Ust-Kamenogorsk TPP LLP |
Energy project |
2016 |
|
59 |
Design of additional sludge pumps and their connection to existing communications of PTs No. 4 of the Aktobe Ferroalloy Plant - a branch of TNC Kazchrome JSC |
TNC Kazchrome JSC |
Technological project |
2016 |
Received a positive conclusion from a comprehensive non-departmental examination |
60 |
Development of a working draft “Telemetric data transmission of TPP 1 - RDC SMES KEGOC JSC” |
Aluminum of Kazakhstan JSC |
Energy project |
2016 |
Received a positive conclusion from a comprehensive non-departmental examination |
