- The Project
- Ekibastuz GRES-1
- KEGOC JSC
- Vostochnyi open-pit mine Eurasian Energy Corporation JSC
- ES JSC "Eurasian Energy Corporation"
- Zhezkazgan TPP, Kazakhmys Corporation LLP
- Ekibastuz GRES-2 Station JSC
- Alga A JSC
- Aktobe Ferroalloy Plant – branch of JSC "TNK "Kazchrome"
- Kazakhmys Smelting LLP
- Shubarkol Komir JSC
- Ust-Kamenogorsk CHPP
- Karaganda BI Energy Plus LLP
- Shulbinskaya HPP
- Aksu Ferroalloy Plant – branch of Transnational company Kazchrome JSC
- Prommashkomplekt LLP
- Kazakhmys Energy LLP
- Energo Spets Stroy LLP
- Aluminum of Kazakhstan JSC
- Nitro Sibir Kazakhstan LLP
- KazTransCom JSC
- Don Ore-Dressing Plant - branch of TNC Kazchrome JSC
- KAZ Minerals Bozshakol LLP
- Bukhtarma Hydropower Complex
- Pavlodar-Soda LLP
- Atyrau Oil Refinery LLP
- Altyn Group LLP
- TechnoGroupService LLP
- PP Solutions LLP
- Kaz Green Energy LLP
- Ekibastuzteploenergo LLP
- Pavlodar-Soda LLP
- Keregetas mine of Aluminum of Kazakhstan JSC
- STEC-3 3-Energoortalyk JSC
- Zhezkazgan Plant of Metal Structures LLP
- Bogatyr Komir LLP
- KSP Steel LLP
- Copper Company Konrad LLP
- Technogruppservice LLP
- Shymkent Thermal Power Plant-3 JSC 3-Energoortalyk
№ | Name | Customer | Type of project | Year | Note |
51 |
Development of working documentation "Power supply of the administrative building, checkpoint and workshop on the territory of the plant under construction for the production of soda ash" |
Pavlodar-Soda LLP |
Energy project |
2020 |
The object was put into operation according to the project |
52 |
Development of a working project "Aluminium of Kazakhstan JSC, PAZ, EEC Replacement of oil circuit breakers with vacuum circuit breakers RP31 in the amount of 39 circuit breakers" |
Aluminum of Kazakhstan JSC |
Energy project |
2020 |
The object was put into operation according to the project |
53 |
Calculation of short circuit currents and relay protection settings for 10 kV conductors |
Aluminum of Kazakhstan JSC |
Energy project |
2019 |
|
54 |
Development “Scheme for power distribution of a wind power plant (Maikaiyn WPP of 50 MW) in the Ekibastuz district, Pavlodar region” |
Altyn Group LLP |
Pre-project work/Renewable energy source |
2019 |
Approval received from KEGOC JSC |
55 |
Work on the implementation (development) of the working project “Reconstruction of the lighting system for the buildings of DPSF, DPSV, DPTO” of Vostochnyi open-pit mine, EEC JSC |
Eurasian Energy Corporation JSC |
Energy project |
2019 |
The positive conclusion of the Gosexpertiza RSE was received. |