KZ RU EN
48/1 Toraighyrov St, Pavlodar city, Republic of Kazakhstan
KZ RU EN
48/1 Toraighyrov St, Pavlodar city, Republic of Kazakhstan
Customer
  • Customer
  • Ekibastuz GRES-1 LLP
  • Sibtechenergo OJSC
  • Ekibastuz-energoremont LLP
  • Karaganda BI Energy Plus LLP
  • Kazakhmys Corporation LLP
  • TekhProject LLP
  • Promyshlennaya Gazoochistka Kazakhstana LLP
  • Eurasian Energy Corporation JSC
  • Karaganda BI Energy LLP
  • KAZPROMPRIBOR LLP
  • Alga A JSC
  • Kazenergonaladka Firm LLP
  • Aktobe HPP JSC
  • Sary-Arka Spetskoks LLP
  • SPACE-MOTOR CJSC
  • AES Ust-Kamenogorsk HPP LLP
  • STROYINDUSTRIYA LLP
  • AES Shulba Hydroelectric Power Station LLP
  • Nur Stroy Pavlodar LLP
  • Firma Partner Plus LLP
  • Energo Spets Stroy LLP
  • Aluminum of Kazakhstan JSC
  • Nitro Sibir Kazakhstan LLP
  • KazTransCom JSC
  • Shubarkol Komir JSC
  • KAZ Minerals Bozshakol LLP
  • SEVKAZENERGOPROM RESEARCH AND PRODUCTION COMPANY LLP
  • Kazzinc LLP
  • TNC Kazchrome JSC
  • Kazpromcontrol LLP
  • Pavlodar-Soda LLP
  • Energometroservice LLP
  • Altyn Group LLP
  • TechnoGroupService LLP
  • EKRA KAZAKHSTAN LLP
  • Kazakhstan Aluminium Smelter JSC
  • Atyrau Oil Refinery LLP
  • Ust-Kamenogorsk TPP LLP
  • Ekibastuzteploenergo LLP
  • RPC «MIR-AS» LLP
  • ENNOVA JSC
  • «Zhezkazgan Plant Of Metal Structures» LLP
  • Astana city construction LLP
  • KSP Steel LLP
Name The objects Type of project Year Note
66

Development of options for the main switchgear scheme in HPP-3 of PAVLODARENERGO JSC regarding optimization of electric power output

KAZ Minerals Bozshakol LLP PAVLODARENERGO JSC

Pre-project work

2017

67

Development of an external power supply scheme of 220 kV to obtain technical conditions for connecting a second 220 kV input to a 220 kV substation of Bozshakol Ore-Dressing Plant

KAZ Minerals Bozshakol LLP

Pre-project work

2017

Coordinated with KEGOC JSC

68

Development of a working project “Reconstruction of industrial downpour sewage at the coke chemical shop site” Shubarkol Komir JSC

Shubarkol Komir JSC

Technological project

2017

69

Development of a working project “220/35/10 kV Substation - Ekibastuz site of Partner Plus Firm LLP. Stage 2 - Construction of 220/35/10 kV Substation

Firma Partner Plus LLP

Energy project

2016-2017

Received a positive conclusion from a comprehensive non-departmental examination. The facility was commissioned according to the project.

70

Work on the development of design documentation for the modernization of relay protection and automation (RPA) of TG st.No.11, AES Ust-Kamenogorsk TPP LLP

AES Ust-Kamenogorsk TPP LLP

Energy project

2016

The facility was commissioned according to the project.

Download reference list