The Project
  • The Project
  • Ekibastuz GRES-1
  • KEGOC JSC
  • Vostochnyi open-pit mine Eurasian Energy Corporation JSC
  • ES JSC "Eurasian Energy Corporation"
  • Zhezkazgan TPP, Kazakhmys Corporation LLP
  • Ekibastuz GRES-2 Station JSC
  • Alga A JSC
  • Aktobe Ferroalloy Plant – branch of JSC "TNK "Kazchrome"
  • Kazakhmys Smelting LLP
  • Shubarkol Komir JSC
  • Ust-Kamenogorsk CHPP
  • Karaganda BI Energy Plus LLP
  • Shulbinskaya HPP
  • Aksu Ferroalloy Plant – branch of Transnational company Kazchrome JSC
  • Prommashkomplekt LLP
  • Kazakhmys Energy LLP
  • Energo Spets Stroy LLP
  • Aluminum of Kazakhstan JSC
  • Nitro Sibir Kazakhstan LLP
  • KazTransCom JSC
  • Don Ore-Dressing Plant - branch of TNC Kazchrome JSC
  • KAZ Minerals Bozshakol LLP
  • Bukhtarma Hydropower Complex
  • Pavlodar-Soda LLP
  • Atyrau Oil Refinery LLP
  • Altyn Group LLP
  • TechnoGroupService LLP
  • PP Solutions LLP
  • Kaz Green Energy LLP
  • Ekibastuzteploenergo LLP
  • Pavlodar-Soda LLP
  • Keregetas mine of Aluminum of Kazakhstan JSC
  • STEC-3 3-Energoortalyk JSC
  • Zhezkazgan Plant of Metal Structures LLP
  • Bogatyr Komir LLP
  • KSP Steel LLP
  • Copper Company Konrad LLP
  • Technogruppservice LLP
  • Shymkent Thermal Power Plant-3 JSC 3-Energoortalyk
Name Customer Type of project Year Note
71

Development of a working project “Power supply of primary crusher with installation of a switchgear 35 kV, BODP”

KAZ Minerals Bozshakol LLP

Energy project

2018

72

Development of a working project “Replacement of a 3T TDTs-400000/220 block transformer” by EEC JSC

Eurasian Energy Corporation JSC

Energy project

2018

The positive conclusion of the comprehensive non-departmental examination by Gosexpertiza RSE was received. The facility was commissioned according to the project.

73

Implementation of the project for the reconstruction of the eastern part of the ring in high-voltage electric transmission lines -6 kV, quarry of KAZ Minerals Bozshakol LLP

KAZ Minerals Bozshakol LLP

Energy project

2018

Received a positive conclusion from a comprehensive non-departmental examination. The facility was commissioned according to the project.

74

Implementation of a working draft on the topic: “Aluminum of Kazakhstan Pavlodar JSC, Pavlodar Aluminum Plant, TPP. Replacement of the main steam pipe k/a. No. 6”

Aluminum of Kazakhstan JSC

Technological project

2018

Received a positive conclusion from a comprehensive non-departmental examination.

75

Development of the working project of Aluminum of Kazakhstan JSC, Pavlodar Aluminum Plant. TPP-1, Pavlodar. Replacement of car dumper VRS-90 No. 2”

Aluminum of Kazakhstan JSC

Technological project

2018

Received a positive conclusion from a comprehensive non-departmental examination.

Download reference list