- The Project
- Ekibastuz GRES-1
- KEGOC JSC
- Vostochnyi open-pit mine Eurasian Energy Corporation JSC
- ES JSC "Eurasian Energy Corporation"
- Zhezkazgan TPP, Kazakhmys Corporation LLP
- Ekibastuz GRES-2 Station JSC
- Alga A JSC
- Aktobe Ferroalloy Plant – branch of JSC "TNK "Kazchrome"
- Kazakhmys Smelting LLP
- Shubarkol Komir JSC
- Ust-Kamenogorsk CHPP
- Karaganda BI Energy Plus LLP
- Shulbinskaya HPP
- Aksu Ferroalloy Plant – branch of Transnational company Kazchrome JSC
- Prommashkomplekt LLP
- Kazakhmys Energy LLP
- Energo Spets Stroy LLP
- Aluminum of Kazakhstan JSC
- Nitro Sibir Kazakhstan LLP
- KazTransCom JSC
- Don Ore-Dressing Plant - branch of TNC Kazchrome JSC
- KAZ Minerals Bozshakol LLP
- Bukhtarma Hydropower Complex
- Pavlodar-Soda LLP
- Atyrau Oil Refinery LLP
- Altyn Group LLP
- TechnoGroupService LLP
- PP Solutions LLP
- Kaz Green Energy LLP
- Ekibastuzteploenergo LLP
- Pavlodar-Soda LLP
- Keregetas mine of Aluminum of Kazakhstan JSC
- STEC-3 3-Energoortalyk JSC
- Zhezkazgan Plant of Metal Structures LLP
- Bogatyr Komir LLP
- KSP Steel LLP
- Copper Company Konrad LLP
- Technogruppservice LLP
- Shymkent Thermal Power Plant-3 JSC 3-Energoortalyk
№ | Name | Customer | Type of project | Year | Note |
71 |
Development of a working project “Power supply of primary crusher with installation of a switchgear 35 kV, BODP” |
KAZ Minerals Bozshakol LLP |
Energy project |
2018 |
|
72 |
Development of a working project “Replacement of a 3T TDTs-400000/220 block transformer” by EEC JSC |
Eurasian Energy Corporation JSC |
Energy project |
2018 |
The positive conclusion of the comprehensive non-departmental examination by Gosexpertiza RSE was received. The facility was commissioned according to the project. |
73 |
Implementation of the project for the reconstruction of the eastern part of the ring in high-voltage electric transmission lines -6 kV, quarry of KAZ Minerals Bozshakol LLP |
KAZ Minerals Bozshakol LLP |
Energy project |
2018 |
Received a positive conclusion from a comprehensive non-departmental examination. The facility was commissioned according to the project. |
74 |
Implementation of a working draft on the topic: “Aluminum of Kazakhstan Pavlodar JSC, Pavlodar Aluminum Plant, TPP. Replacement of the main steam pipe k/a. No. 6” |
Aluminum of Kazakhstan JSC |
Technological project |
2018 |
Received a positive conclusion from a comprehensive non-departmental examination. |
75 |
Development of the working project of Aluminum of Kazakhstan JSC, Pavlodar Aluminum Plant. TPP-1, Pavlodar. Replacement of car dumper VRS-90 No. 2” |
Aluminum of Kazakhstan JSC |
Technological project |
2018 |
Received a positive conclusion from a comprehensive non-departmental examination. |