- The Project
- Ekibastuz GRES-1
- KEGOC JSC
- Vostochnyi open-pit mine Eurasian Energy Corporation JSC
- ES JSC "Eurasian Energy Corporation"
- Zhezkazgan TPP, Kazakhmys Corporation LLP
- Ekibastuz GRES-2 Station JSC
- Alga A JSC
- Aktobe Ferroalloy Plant – branch of JSC "TNK "Kazchrome"
- Kazakhmys Smelting LLP
- Shubarkol Komir JSC
- Ust-Kamenogorsk CHPP
- Karaganda BI Energy Plus LLP
- Shulbinskaya HPP
- Aksu Ferroalloy Plant – branch of Transnational company Kazchrome JSC
- Prommashkomplekt LLP
- Kazakhmys Energy LLP
- Energo Spets Stroy LLP
- Aluminum of Kazakhstan JSC
- Nitro Sibir Kazakhstan LLP
- KazTransCom JSC
- Don Ore-Dressing Plant - branch of TNC Kazchrome JSC
- KAZ Minerals Bozshakol LLP
- Bukhtarma Hydropower Complex
- Pavlodar-Soda LLP
- Atyrau Oil Refinery LLP
- Altyn Group LLP
- TechnoGroupService LLP
- PP Solutions LLP
- Kaz Green Energy LLP
- Ekibastuzteploenergo LLP
- Pavlodar-Soda LLP
- Keregetas mine of Aluminum of Kazakhstan JSC
- STEC-3 3-Energoortalyk JSC
- Zhezkazgan Plant of Metal Structures LLP
- Bogatyr Komir LLP
- KSP Steel LLP
- Copper Company Konrad LLP
- Technogruppservice LLP
- Shymkent Thermal Power Plant-3 JSC 3-Energoortalyk
№ | Name | Customer | Type of project | Year | Note |
91 |
Construction of a stationary universal line for technical control of cars and trucks, buses and road trains with an axle load of up to 10 tons (LTK-10U-SP-11) of the Don Ore- Dressing Plant - branch of TNC Kazchrome JSC |
TNC Kazchrome JSC |
Technological project |
2017 |
Received a positive conclusion from a comprehensive non-departmental examination. |
92 |
Implementation of design and estimate documentation for Aluminum of Kazakhstan JSC, Pavlodar, Pavlodar Aluminum Plant, EEC. Replacement of the TM-310 telemechanics complex and GPP-2 mnemonboard with an automated dispatch control system for the plant’s power supply (ASDU) |
Aluminum of Kazakhstan JSC |
Energy project |
2017 |
Received a positive conclusion from a comprehensive non-departmental examination. |
93 |
Development of working documentation “Replacement of a generator circuit breaker with reference to an existing switchgear RU-13.8kV, Bukhtarma Hydropower Complex |
Kazzinc LLP |
Energy project/Renewable energy source |
2017 |
|
94 |
Development of the working project “Replacement of the supply and exhaust ventilation of the TTTs”, PP of EEC JSC |
Eurasian Energy Corporation JSC |
Technological project |
2017-2018 |
Received a positive conclusion from a comprehensive non-departmental examination |
95 |
Development of a project for differential bus protection of outdoor switch-gear-1 |
Ust-Kamenogorsk TPP LLP |
Energy project |
2017 |
The facility was commissioned according to the project. |