KZ RU EN
48/1 Toraighyrov St, Pavlodar city, Republic of Kazakhstan
KZ RU EN
48/1 Toraighyrov St, Pavlodar city, Republic of Kazakhstan
The Project
  • The Project
  • Ekibastuz GRES-1
  • KEGOC JSC
  • Vostochnyi open-pit mine Eurasian Energy Corporation JSC
  • ES JSC "Eurasian Energy Corporation"
  • Zhezkazgan TPP, Kazakhmys Corporation LLP
  • Ekibastuz GRES-2 Station JSC
  • Alga A JSC
  • Aktobe Ferroalloy Plant – branch of JSC "TNK "Kazchrome"
  • Kazakhmys Smelting LLP
  • Shubarkol Komir JSC
  • Ust-Kamenogorsk CHPP
  • Karaganda BI Energy Plus LLP
  • Shulbinskaya HPP
  • Aksu Ferroalloy Plant – branch of Transnational company Kazchrome JSC
  • Prommashkomplekt LLP
  • Kazakhmys Energy LLP
  • Energo Spets Stroy LLP
  • Aluminum of Kazakhstan JSC
  • Nitro Sibir Kazakhstan LLP
  • KazTransCom JSC
  • Don Ore-Dressing Plant - branch of TNC Kazchrome JSC
  • KAZ Minerals Bozshakol LLP
  • Bukhtarma Hydropower Complex
  • Pavlodar-Soda LLP
  • Atyrau Oil Refinery LLP
  • Altyn Group LLP
  • TechnoGroupService LLP
  • PP Solutions LLP
  • Kaz Green Energy LLP
  • Ekibastuzteploenergo LLP
  • Pavlodar-Soda LLP
  • Keregetas mine of Aluminum of Kazakhstan JSC
  • STEC-3 3-Energoortalyk JSC
  • Zhezkazgan Plant of Metal Structures LLP
  • Bogatyr Komir LLP
  • KSP Steel LLP
  • Copper Company Konrad LLP
  • Technogruppservice LLP
  • Shymkent Thermal Power Plant-3 JSC 3-Energoortalyk
Name Customer Type of project Year Note
91

Construction of a stationary universal line for technical control of cars and trucks, buses and road trains with an axle load of up to 10 tons (LTK-10U-SP-11) of the Don Ore- Dressing Plant - branch of TNC Kazchrome JSC

TNC Kazchrome JSC

Technological project

2017

Received a positive conclusion from a comprehensive non-departmental examination.

92

Implementation of design and estimate documentation for Aluminum of Kazakhstan JSC, Pavlodar, Pavlodar Aluminum Plant, EEC. Replacement of the TM-310 telemechanics complex and GPP-2 mnemonboard with an automated dispatch control system for the plant’s power supply (ASDU)

Aluminum of Kazakhstan JSC

Energy project

2017

Received a positive conclusion from a comprehensive non-departmental examination.

93

Development of working documentation “Replacement of a generator circuit breaker with reference to an existing switchgear RU-13.8kV, Bukhtarma Hydropower Complex

Kazzinc LLP

Energy project/Renewable energy source

2017

94

Development of the working project “Replacement of the supply and exhaust ventilation of the TTTs”, PP of EEC JSC

Eurasian Energy Corporation JSC

Technological project

2017-2018

Received a positive conclusion from a comprehensive non-departmental examination

95

Development of a project for differential bus protection of outdoor switch-gear-1

Ust-Kamenogorsk TPP LLP

Energy project

2017

The facility was commissioned according to the project.

Download reference list