- Customer
- Ekibastuz GRES-1 LLP
- Sibtechenergo OJSC
- Ekibastuz-energoremont LLP
- Karaganda BI Energy Plus LLP
- Kazakhmys Corporation LLP
- TekhProject LLP
- Promyshlennaya Gazoochistka Kazakhstana LLP
- Eurasian Energy Corporation JSC
- Karaganda BI Energy LLP
- KAZPROMPRIBOR LLP
- Alga A JSC
- Kazenergonaladka Firm LLP
- Aktobe HPP JSC
- Sary-Arka Spetskoks LLP
- SPACE-MOTOR CJSC
- AES Ust-Kamenogorsk HPP LLP
- STROYINDUSTRIYA LLP
- AES Shulba Hydroelectric Power Station LLP
- Nur Stroy Pavlodar LLP
- Firma Partner Plus LLP
- Energo Spets Stroy LLP
- Aluminum of Kazakhstan JSC
- Nitro Sibir Kazakhstan LLP
- KazTransCom JSC
- Shubarkol Komir JSC
- KAZ Minerals Bozshakol LLP
- SEVKAZENERGOPROM RESEARCH AND PRODUCTION COMPANY LLP
- Kazzinc LLP
- TNC Kazchrome JSC
- Kazpromcontrol LLP
- Pavlodar-Soda LLP
- Energometroservice LLP
- Altyn Group LLP
- TechnoGroupService LLP
- EKRA KAZAKHSTAN LLP
- Kazakhstan Aluminium Smelter JSC
- Atyrau Oil Refinery LLP
- Ust-Kamenogorsk TPP LLP
№ | Name | The objects | Type of project | Year | Note |
91 |
Adaptation of project documentation “The first start-up complex of a turbine unit, station No. 12 120 MW” |
AES Ust-Kamenogorsk TPP LLP |
Technological project/Energy project |
2013-2014 |
The positive conclusion of the Gosexpertiza RSE was received. The facility was commissioned according to the project |
92 |
Power distribution scheme 1st start-up complex of a turbine unit, station No. 12, AES Ust-Kamenogorsk TPP LLP |
AES Ust-Kamenogorsk TPP LLP |
Pre-project work |
2013-2014 |
Approval has been obtained, VK REC JSC, KEGOC JSC. Approved by the Ministry of Energy of the Republic of Kazakhstan |
93 |
Expert examination of the underpass, assessment of the technical condition with the development of technical solutions for strengthening building structures |
Bulat Nurzhanov Ekibastuz GRES-1 LLP |
Architectural and construction project |
2013 |
The facility was commissioned according to the project |
94 |
Development of design documentation for strengthening the building structure of the 1B car dumper |
Bulat Nurzhanov Ekibastuz GRES-1 LLP |
Architectural and construction project |
2013 |
The facility was commissioned according to the project |
95 |
Development of design documentation for reinforcing the structure of a fireproof wall in the substation unit No. 3 |
Bulat Nurzhanov Ekibastuz GRES-1 LLP |
Architectural and construction project |
2013 |
The facility was commissioned according to the project |