KZ RU EN
48/1 Toraighyrov St, Pavlodar city, Republic of Kazakhstan
KZ RU EN
48/1 Toraighyrov St, Pavlodar city, Republic of Kazakhstan
The Project
  • The Project
  • Ekibastuz GRES-1
  • KEGOC JSC
  • Vostochnyi open-pit mine Eurasian Energy Corporation JSC
  • ES JSC "Eurasian Energy Corporation"
  • Zhezkazgan TPP, Kazakhmys Corporation LLP
  • Ekibastuz GRES-2 Station JSC
  • Alga A JSC
  • Aktobe Ferroalloy Plant – branch of JSC "TNK "Kazchrome"
  • Kazakhmys Smelting LLP
  • Shubarkol Komir JSC
  • Ust-Kamenogorsk CHPP
  • Karaganda BI Energy Plus LLP
  • Shulbinskaya HPP
  • Aksu Ferroalloy Plant – branch of Transnational company Kazchrome JSC
  • Prommashkomplekt LLP
  • Kazakhmys Energy LLP
  • Energo Spets Stroy LLP
  • Aluminum of Kazakhstan JSC
  • Nitro Sibir Kazakhstan LLP
  • KazTransCom JSC
  • Don Ore-Dressing Plant - branch of TNC Kazchrome JSC
  • KAZ Minerals Bozshakol LLP
  • Bukhtarma Hydropower Complex
  • Pavlodar-Soda LLP
  • Atyrau Oil Refinery LLP
  • Altyn Group LLP
  • TechnoGroupService LLP
  • PP Solutions LLP
  • Kaz Green Energy LLP
  • Ekibastuzteploenergo LLP
  • Pavlodar-Soda LLP
  • Keregetas mine of Aluminum of Kazakhstan JSC
  • STEC-3 3-Energoortalyk JSC
  • Zhezkazgan Plant of Metal Structures LLP
  • Bogatyr Komir LLP
  • KSP Steel LLP
  • Copper Company Konrad LLP
  • Technogruppservice LLP
  • Shymkent Thermal Power Plant-3 JSC 3-Energoortalyk
Name Customer Type of project Year Note
96

Development of a working project: “HPP. Modernization of the electric drive SN-3 with the installation of frequency regulation”

Aluminum of Kazakhstan JSC

Energy project

2017-2018

Received a positive conclusion from a comprehensive non-departmental examination.

97

Reconstruction of the ventilation system and premises in the sections of the Electric Shop in accordance with the new standard approved by ERG, Don ODP -branch of TNC Kazchrome JSC

TNC Kazchrome JSC

Technological project/Architectural and construction project

2017

Received a positive conclusion from a comprehensive non-departmental examination.

98

Reconstruction of the ventilation system and the premises in the building of the REM site of the Electric Shop in accordance with the new standard approved by ERG, Donskoy GOK - a branch of JSC TNK Kazchrome

TNC Kazchrome JSC

Technological project/Architectural and construction project

2017

Received a positive conclusion from a comprehensive non-departmental examination.

99

Verification calculation of the TE-31 pipelines for the strength and self-compensation of temperature expansions, with the issuance of a conclusion about the suitability for further operation

Kazpromcontrol LLP

Technological project

2017

100

Implementation of design and estimate documentation for Aluminum of Kazakhstan JSC, Pavlodar, Pavlodar Aluminum Plant, EEC. Replacement of the TM-310 telemechanics complex and GPP-2 mnemonboard with an automated dispatch control system for the plant’s power supply (ASDU)

Aluminum of Kazakhstan JSC

Energy project

2017

Received a positive conclusion from a comprehensive non-departmental examination.

Download reference list