- The Project
- Ekibastuz GRES-1 LLP
- KEGOC JSC
- Bulat Nurzhanov Ekibastuz GRES-1 LLP
- Object: Bulat Nurzhanov Ekibastuz GRES-1 LLP, Facility: Ekibastuz-energoremont LLP
- Vostochnyi open-pit mine Eurasian Energy Corporation JSC
- Eurasian Energy Corporation JSC Power Plant
- Zhezkazgan TPP, Kazakhmys Corporation LLP
- Ekibastuz GRES-2 Station JSC
- Alga A JSC
- Eurasian Energy Corporation JSC PP
- Aktobe HPP JSC
- Eurasian Energy Corporation JSC
- Kazakhmys Smelting LLP, Balkhash, Kazakhstan
- Sary-Arka Spetskoks LLP
- AES Ust-Kamenogorsk HPP LLP
- Karaganda BI Energy Plus LLP
- AES Ust-Kamenogorsk TPP LLP
- AES Shulba Hydroelectric Power Station LLP
- Aksu Ferroalloy Plant – branch of Transnational company Kazchrome JSC
- Firma Partner Plus LLP
- Kazakhmys Energy LLP
- Power plant of Eurasian Energy Corporation JSC
- Energo Spets Stroy LLP
- Aluminum of Kazakhstan JSC
- Nitro Sibir Kazakhstan LLP
- KazTransCom JSC
- TNC Kazchrome JSC
- Don Mining and Processing Plant
- Don Mining and Processing Plant Aktobe Ferroalloy Plant
- Shubarkol Komir JSC
- KAZ Minerals Bozshakol LLP
- KAZ Minerals Bozshakol LLP PAVLODARENERGO JSC
- Don Ore-Dressing Plant - branch of TNC Kazchrome JSC
- Bukhtarma Hydropower Complex
- PP of Eurasian Energy Corporation JSC
- Ust-Kamenogorsk TPP LLP
- HPP of Aluminum of Kazakhstan JSC
- Kazakhstan Aluminium Smelter JSC
- TPP of Aluminum of Kazakhstan JSC
- Pavlodar-Soda LLP
- Atyrau Oil Refinery LLP
- Altyn Group LLP
- TechnoGroupService LLP
- PP Solutions LLP
- Branch of Aluminum of Kazakhstan JSC Krasnooktyabrsk bauxite ore department
- Kaz Green Energy LLP
- Don Ore-Dressing Plant - a branch of TNC Kazchrome JSC
- Ekibastuzteploenergo LLP
- «Vostochny» section of Euro-Asian Energy Corporation JSC
- Pavlodar-Soda LLP
- «Keregetas» mine of «Aluminum of Kazakhstan» JSC
- Krasnooktyabrskoe bauxite ore management of «Aluminum of Kazakhstan» JSC
- STEC-3 «3-Energoortalyk» JSC
- «Zhezkazgan Plant Of Metal Structures» LLP
- Bogatyr Komir LLP
- KSP Steel LLP
- "Aluminum of Kazakhstan" JSC
- Prommashkomplekt LLP
- "Shubarkol Komir" JSC
- ES "Eurasian Energy Corporation" JSC
- Ust-Kamenogorsk CHP LLP
- Copper Company Konrad LLP
- STEC-3 "3-Energoortalyk" JSC
- Technogruppservice LLP
- Ust-Kamenogorsk CHPP LLP
- Zhezkazgan Plant of Metal Structures LLP
- Shymkent Thermal Power Plant-3 JSC "3-Energoortalyk"
- Mine Keregetas, Aluminium of Kazakhstan JSC
- Krasnooktyabrskoye bauxite mining department of Aluminum of Kazakhstan JSC
- Kazakhmys Energy LLP GRES
№ | Name | Customer | Type of project | Year | Note |
106 |
Development of a working project “Installation of heat ventilation units for the needs of sulfide and oxide production of BODP” |
KAZ Minerals Bozshakol LLP |
Technological project |
2017-2018 |
|
107 |
Development of the working project “Railway weigh station” |
Kazakhstan Aluminium Smelter JSC |
Energy project |
2017-2018 |
Received a positive conclusion from a comprehensive non-departmental examination. |
108 |
Development of a working draft of external power supply with the connection of the second high-voltage input 220 kV PS-220/35 kV BODP from VL-2347 with the installation of the third transform |
KAZ Minerals Bozshakol LLP |
Energy project |
2017 |
Received a positive conclusion from a comprehensive non-departmental examination. The facility was commissioned according to the project. |
109 |
Services for the verification calculation of the TE-31 pipelines (owned by AES Ust-Kamenogorsk TPP LLP) for the strength and self-compensation of temperature expansions, with the issuance of |
|
Technological project |
2017 |
|
110 |
Development of a working project “Replacement of a car dumper VRS-90 No. 1 at the TPP of Aluminum of Kazakhstan JSC” |
Aluminum of Kazakhstan JSC |
Technological project |
2016 |
Received a positive conclusion from a comprehensive non-departmental examination |
