- The Project
- Ekibastuz GRES-1
- KEGOC JSC
- Vostochnyi open-pit mine Eurasian Energy Corporation JSC
- ES JSC "Eurasian Energy Corporation"
- Zhezkazgan TPP, Kazakhmys Corporation LLP
- Ekibastuz GRES-2 Station JSC
- Alga A JSC
- Aktobe Ferroalloy Plant – branch of JSC "TNK "Kazchrome"
- Kazakhmys Smelting LLP
- Shubarkol Komir JSC
- Ust-Kamenogorsk CHPP
- Karaganda BI Energy Plus LLP
- Shulbinskaya HPP
- Aksu Ferroalloy Plant – branch of Transnational company Kazchrome JSC
- Prommashkomplekt LLP
- Kazakhmys Energy LLP
- Energo Spets Stroy LLP
- Aluminum of Kazakhstan JSC
- Nitro Sibir Kazakhstan LLP
- KazTransCom JSC
- Don Ore-Dressing Plant - branch of TNC Kazchrome JSC
- KAZ Minerals Bozshakol LLP
- Bukhtarma Hydropower Complex
- Pavlodar-Soda LLP
- Atyrau Oil Refinery LLP
- Altyn Group LLP
- TechnoGroupService LLP
- PP Solutions LLP
- Kaz Green Energy LLP
- Ekibastuzteploenergo LLP
- Pavlodar-Soda LLP
- Keregetas mine of Aluminum of Kazakhstan JSC
- STEC-3 3-Energoortalyk JSC
- Zhezkazgan Plant of Metal Structures LLP
- Bogatyr Komir LLP
- KSP Steel LLP
- Copper Company Konrad LLP
- Technogruppservice LLP
- Shymkent Thermal Power Plant-3 JSC 3-Energoortalyk
№ | Name | Customer | Type of project | Year | Note |
101 |
Reconstruction of ventilation with the restoration of the supply and exhaust system with connection to the cabinets and reconstruction of the premises in the administration building ShSTs in accordance with the new standard approved by ERG for DODP |
TNC Kazchrome JSC |
Technological project/Architectural and construction project |
2017 |
Received a positive conclusion from a comprehensive non-departmental examination. |
102 |
Development of a working project “Installation of heat ventilation units for the needs of sulfide and oxide production of BODP” |
KAZ Minerals Bozshakol LLP |
Technological project |
2017-2018 |
|
103 |
Development of the working project “Railway weigh station” |
Kazakhstan Aluminium Smelter JSC |
Energy project |
2017-2018 |
Received a positive conclusion from a comprehensive non-departmental examination. |
104 |
Working draft of external power supply with the connection of the second high-voltage input 220 kV PS-220/35 kV BODP from VL-2347 with the installation of the third transformer 125 MVA |
KAZ Minerals Bozshakol LLP |
Energy project |
2017 |
Received a positive conclusion from a comprehensive non-departmental examination.The facility was commissioned according to the project. |
105 |
Development of a working draft of external power supply with the connection of the second high-voltage input 220 kV PS-220/35 kV BODP from VL-2347 with the installation of the third transform |
KAZ Minerals Bozshakol LLP |
Energy project |
2017 |
Received a positive conclusion from a comprehensive non-departmental examination. The facility was commissioned according to the project. |