KZ RU EN
48/1 Toraighyrov St, Pavlodar city, Republic of Kazakhstan
KZ RU EN
48/1 Toraighyrov St, Pavlodar city, Republic of Kazakhstan
The Project
  • The Project
  • Ekibastuz GRES-1
  • KEGOC JSC
  • Vostochnyi open-pit mine Eurasian Energy Corporation JSC
  • ES JSC "Eurasian Energy Corporation"
  • Zhezkazgan TPP, Kazakhmys Corporation LLP
  • Ekibastuz GRES-2 Station JSC
  • Alga A JSC
  • Aktobe Ferroalloy Plant – branch of JSC "TNK "Kazchrome"
  • Kazakhmys Smelting LLP
  • Shubarkol Komir JSC
  • Ust-Kamenogorsk CHPP
  • Karaganda BI Energy Plus LLP
  • Shulbinskaya HPP
  • Aksu Ferroalloy Plant – branch of Transnational company Kazchrome JSC
  • Prommashkomplekt LLP
  • Kazakhmys Energy LLP
  • Energo Spets Stroy LLP
  • Aluminum of Kazakhstan JSC
  • Nitro Sibir Kazakhstan LLP
  • KazTransCom JSC
  • Don Ore-Dressing Plant - branch of TNC Kazchrome JSC
  • KAZ Minerals Bozshakol LLP
  • Bukhtarma Hydropower Complex
  • Pavlodar-Soda LLP
  • Atyrau Oil Refinery LLP
  • Altyn Group LLP
  • TechnoGroupService LLP
  • PP Solutions LLP
  • Kaz Green Energy LLP
  • Ekibastuzteploenergo LLP
  • Pavlodar-Soda LLP
  • Keregetas mine of Aluminum of Kazakhstan JSC
  • STEC-3 3-Energoortalyk JSC
  • Zhezkazgan Plant of Metal Structures LLP
  • Bogatyr Komir LLP
  • KSP Steel LLP
  • Copper Company Konrad LLP
  • Technogruppservice LLP
  • Shymkent Thermal Power Plant-3 JSC 3-Energoortalyk
Name Customer Type of project Year Note
116

Reconstruction of the supply and exhaust ventilation system of the Environment Protection and Industrial Sanitation Laboratory building (inv. No. 159), DGOK, Khromtau, TNC Kazchrome JSC

TNC Kazchrome JSC

Technological project

2016

Received a positive conclusion from a comprehensive non-departmental examination.

117

Reconstruction of the 110/10 kV gas-supply plant for power supply of workshop No. 4 of the Aktobe Ferroalloy Plant - a branch of TNC Kazchrome JSC

TNC Kazchrome JSC

Energy project

2016

Received a positive conclusion from a comprehensive non-departmental examination. The facility was commissioned according to the project.

118

Work on the development of design documentation for the modernization of relay protection and automation (RPA) of TG st.No.11, AES Ust-Kamenogorsk TPP LLP

AES Ust-Kamenogorsk HPP LLP

Energy project

2016

The facility was commissioned according to the project.

119

Development of a working project “220/35/10 kV Substation - Ekibastuz site of Partner Plus Firm LLP. Stage 2 - Construction of 220/35/10 kV Substation

Firma Partner Plus LLP

Energy project

2016-2017

Received a positive conclusion from a comprehensive non-departmental examination. The facility was commissioned according to the project.

120

Development of design and estimate documentation for PS-220 kV, Firma Partner Plus LLP. Stage 1. Construction of 220 kV overhead lines "

Firma Partner Plus LLP

Energy project

2015

The positive conclusion of the Gosexpertiza RSE was received. The facility was commissioned according to the project.

Download reference list