The Project
  • The Project
  • Ekibastuz GRES-1 LLP
  • KEGOC JSC
  • Bulat Nurzhanov Ekibastuz GRES-1 LLP
  • Object: Bulat Nurzhanov Ekibastuz GRES-1 LLP, Facility: Ekibastuz-energoremont LLP
  • Vostochnyi open-pit mine Eurasian Energy Corporation JSC
  • Eurasian Energy Corporation JSC Power Plant
  • Zhezkazgan TPP, Kazakhmys Corporation LLP
  • Ekibastuz GRES-2 Station JSC
  • Alga A JSC
  • Eurasian Energy Corporation JSC PP
  • Aktobe HPP JSC
  • Eurasian Energy Corporation JSC
  • Kazakhmys Smelting LLP, Balkhash, Kazakhstan
  • Sary-Arka Spetskoks LLP
  • AES Ust-Kamenogorsk HPP LLP
  • Karaganda BI Energy Plus LLP
  • AES Ust-Kamenogorsk TPP LLP
  • AES Shulba Hydroelectric Power Station LLP
  • Aksu Ferroalloy Plant – branch of Transnational company Kazchrome JSC
  • Firma Partner Plus LLP
  • Kazakhmys Energy LLP
  • Power plant of Eurasian Energy Corporation JSC
  • Energo Spets Stroy LLP
  • Aluminum of Kazakhstan JSC
  • Nitro Sibir Kazakhstan LLP
  • KazTransCom JSC
  • TNC Kazchrome JSC
  • Don Mining and Processing Plant
  • Don Mining and Processing Plant Aktobe Ferroalloy Plant
  • Shubarkol Komir JSC
  • KAZ Minerals Bozshakol LLP
  • KAZ Minerals Bozshakol LLP PAVLODARENERGO JSC
  • Don Ore-Dressing Plant - branch of TNC Kazchrome JSC
  • Bukhtarma Hydropower Complex
  • PP of Eurasian Energy Corporation JSC
  • Ust-Kamenogorsk TPP LLP
  • HPP of Aluminum of Kazakhstan JSC
  • Kazakhstan Aluminium Smelter JSC
  • TPP of Aluminum of Kazakhstan JSC
  • Pavlodar-Soda LLP
  • Atyrau Oil Refinery LLP
  • Altyn Group LLP
  • TechnoGroupService LLP
  • PP Solutions LLP
  • Branch of Aluminum of Kazakhstan JSC Krasnooktyabrsk bauxite ore department
  • Kaz Green Energy LLP
  • Don Ore-Dressing Plant - a branch of TNC Kazchrome JSC
  • Ekibastuzteploenergo LLP
  • «Vostochny» section of Euro-Asian Energy Corporation JSC
  • Pavlodar-Soda LLP
  • «Keregetas» mine of «Aluminum of Kazakhstan» JSC
  • Krasnooktyabrskoe bauxite ore management of «Aluminum of Kazakhstan» JSC
  • STEC-3 «3-Energoortalyk» JSC
  • «Zhezkazgan Plant Of Metal Structures» LLP
  • Bogatyr Komir LLP
  • KSP Steel LLP
  • "Aluminum of Kazakhstan" JSC
  • Prommashkomplekt LLP
  • "Shubarkol Komir" JSC
  • ES "Eurasian Energy Corporation" JSC
  • Ust-Kamenogorsk CHP LLP
  • Copper Company Konrad LLP
  • STEC-3 "3-Energoortalyk" JSC
  • Technogruppservice LLP
  • Ust-Kamenogorsk CHPP LLP
  • Zhezkazgan Plant of Metal Structures LLP
  • Shymkent Thermal Power Plant-3 JSC "3-Energoortalyk"
  • Mine Keregetas, Aluminium of Kazakhstan JSC
  • Krasnooktyabrskoye bauxite mining department of Aluminum of Kazakhstan JSC
  • Kazakhmys Energy LLP GRES
Name Customer Type of project Year Note
121

Reconstruction of the 110/10 kV gas-supply plant for power supply of workshop No. 4 of the Aktobe Ferroalloy Plant - a branch of TNC Kazchrome JSC

TNC Kazchrome JSC

Energy project

2016

Received a positive conclusion from a comprehensive non-departmental examination. The facility was commissioned according to the project.

122

Work on the development of design documentation for the modernization of relay protection and automation (RPA) of TG st.No.11, AES Ust-Kamenogorsk TPP LLP

AES Ust-Kamenogorsk HPP LLP

Energy project

2016

The facility was commissioned according to the project.

123

Development of a working project “220/35/10 kV Substation - Ekibastuz site of Partner Plus Firm LLP. Stage 2 - Construction of 220/35/10 kV Substation

Firma Partner Plus LLP

Energy project

2016-2017

Received a positive conclusion from a comprehensive non-departmental examination. The facility was commissioned according to the project.

124

Development of design and estimate documentation for PS-220 kV, Firma Partner Plus LLP. Stage 1. Construction of 220 kV overhead lines "

Firma Partner Plus LLP

Energy project

2015

The positive conclusion of the Gosexpertiza RSE was received. The facility was commissioned according to the project.

125

Reconstruction of connections of 35, 110, 220 kV substations with the replacement relay protection and automation equipment with microprocessor protection, state district power plant

Kazenergonaladka Firm LLP

Energy project

2015-2016

The positive conclusion of the Gosexpertiza RSE was received.

Download reference list