- The Project
- Ekibastuz GRES-1 LLP
- KEGOC JSC
- Bulat Nurzhanov Ekibastuz GRES-1 LLP
- Object: Bulat Nurzhanov Ekibastuz GRES-1 LLP, Facility: Ekibastuz-energoremont LLP
- Vostochnyi open-pit mine Eurasian Energy Corporation JSC
- Eurasian Energy Corporation JSC Power Plant
- Zhezkazgan TPP, Kazakhmys Corporation LLP
- Ekibastuz GRES-2 Station JSC
- Alga A JSC
- Eurasian Energy Corporation JSC PP
- Aktobe HPP JSC
- Eurasian Energy Corporation JSC
- Kazakhmys Smelting LLP, Balkhash, Kazakhstan
- Sary-Arka Spetskoks LLP
- AES Ust-Kamenogorsk HPP LLP
- Karaganda BI Energy Plus LLP
- AES Ust-Kamenogorsk TPP LLP
- AES Shulba Hydroelectric Power Station LLP
- Aksu Ferroalloy Plant – branch of Transnational company Kazchrome JSC
- Firma Partner Plus LLP
- Kazakhmys Energy LLP
- Power plant of Eurasian Energy Corporation JSC
- Energo Spets Stroy LLP
- Aluminum of Kazakhstan JSC
- Nitro Sibir Kazakhstan LLP
- KazTransCom JSC
- TNC Kazchrome JSC
- Don Mining and Processing Plant
- Don Mining and Processing Plant Aktobe Ferroalloy Plant
- Shubarkol Komir JSC
- KAZ Minerals Bozshakol LLP
- KAZ Minerals Bozshakol LLP PAVLODARENERGO JSC
- Don Ore-Dressing Plant - branch of TNC Kazchrome JSC
- Bukhtarma Hydropower Complex
- PP of Eurasian Energy Corporation JSC
- Ust-Kamenogorsk TPP LLP
- HPP of Aluminum of Kazakhstan JSC
- Kazakhstan Aluminium Smelter JSC
- TPP of Aluminum of Kazakhstan JSC
- Pavlodar-Soda LLP
- Atyrau Oil Refinery LLP
- Altyn Group LLP
- TechnoGroupService LLP
- PP Solutions LLP
- Branch of Aluminum of Kazakhstan JSC Krasnooktyabrsk bauxite ore department
- Kaz Green Energy LLP
- Don Ore-Dressing Plant - a branch of TNC Kazchrome JSC
- Ekibastuzteploenergo LLP
- «Vostochny» section of Euro-Asian Energy Corporation JSC
- Pavlodar-Soda LLP
- «Keregetas» mine of «Aluminum of Kazakhstan» JSC
- Krasnooktyabrskoe bauxite ore management of «Aluminum of Kazakhstan» JSC
- STEC-3 «3-Energoortalyk» JSC
- «Zhezkazgan Plant Of Metal Structures» LLP
- Bogatyr Komir LLP
- KSP Steel LLP
- "Aluminum of Kazakhstan" JSC
- Prommashkomplekt LLP
- "Shubarkol Komir" JSC
- ES "Eurasian Energy Corporation" JSC
- Ust-Kamenogorsk CHP LLP
- Copper Company Konrad LLP
- STEC-3 "3-Energoortalyk" JSC
- Technogruppservice LLP
- Ust-Kamenogorsk CHPP LLP
- Zhezkazgan Plant of Metal Structures LLP
- Shymkent Thermal Power Plant-3 JSC "3-Energoortalyk"
- Mine Keregetas, Aluminium of Kazakhstan JSC
- Krasnooktyabrskoye bauxite mining department of Aluminum of Kazakhstan JSC
- Kazakhmys Energy LLP GRES
№ | Name | Customer | Type of project | Year | Note |
121 |
Reconstruction of the 110/10 kV gas-supply plant for power supply of workshop No. 4 of the Aktobe Ferroalloy Plant - a branch of TNC Kazchrome JSC |
TNC Kazchrome JSC |
Energy project |
2016 |
Received a positive conclusion from a comprehensive non-departmental examination. The facility was commissioned according to the project. |
122 |
Work on the development of design documentation for the modernization of relay protection and automation (RPA) of TG st.No.11, AES Ust-Kamenogorsk TPP LLP |
AES Ust-Kamenogorsk HPP LLP |
Energy project |
2016 |
The facility was commissioned according to the project. |
123 |
Development of a working project “220/35/10 kV Substation - Ekibastuz site of Partner Plus Firm LLP. Stage 2 - Construction of 220/35/10 kV Substation |
Firma Partner Plus LLP |
Energy project |
2016-2017 |
Received a positive conclusion from a comprehensive non-departmental examination. The facility was commissioned according to the project. |
124 |
Development of design and estimate documentation for PS-220 kV, Firma Partner Plus LLP. Stage 1. Construction of 220 kV overhead lines " |
Firma Partner Plus LLP |
Energy project |
2015 |
The positive conclusion of the Gosexpertiza RSE was received. The facility was commissioned according to the project. |
125 |
Reconstruction of connections of 35, 110, 220 kV substations with the replacement relay protection and automation equipment with microprocessor protection, state district power plant |
Kazenergonaladka Firm LLP |
Energy project |
2015-2016 |
The positive conclusion of the Gosexpertiza RSE was received. |
