KZ RU EN
48/1 Toraighyrov St, Pavlodar city, Republic of Kazakhstan
KZ RU EN
48/1 Toraighyrov St, Pavlodar city, Republic of Kazakhstan
The Project
  • The Project
  • Ekibastuz GRES-1
  • KEGOC JSC
  • Vostochnyi open-pit mine Eurasian Energy Corporation JSC
  • ES JSC "Eurasian Energy Corporation"
  • Zhezkazgan TPP, Kazakhmys Corporation LLP
  • Ekibastuz GRES-2 Station JSC
  • Alga A JSC
  • Aktobe Ferroalloy Plant – branch of JSC "TNK "Kazchrome"
  • Kazakhmys Smelting LLP
  • Shubarkol Komir JSC
  • Ust-Kamenogorsk CHPP
  • Karaganda BI Energy Plus LLP
  • Shulbinskaya HPP
  • Aksu Ferroalloy Plant – branch of Transnational company Kazchrome JSC
  • Prommashkomplekt LLP
  • Kazakhmys Energy LLP
  • Energo Spets Stroy LLP
  • Aluminum of Kazakhstan JSC
  • Nitro Sibir Kazakhstan LLP
  • KazTransCom JSC
  • Don Ore-Dressing Plant - branch of TNC Kazchrome JSC
  • KAZ Minerals Bozshakol LLP
  • Bukhtarma Hydropower Complex
  • Pavlodar-Soda LLP
  • Atyrau Oil Refinery LLP
  • Altyn Group LLP
  • TechnoGroupService LLP
  • PP Solutions LLP
  • Kaz Green Energy LLP
  • Ekibastuzteploenergo LLP
  • Pavlodar-Soda LLP
  • Keregetas mine of Aluminum of Kazakhstan JSC
  • STEC-3 3-Energoortalyk JSC
  • Zhezkazgan Plant of Metal Structures LLP
  • Bogatyr Komir LLP
  • KSP Steel LLP
  • Copper Company Konrad LLP
  • Technogruppservice LLP
  • Shymkent Thermal Power Plant-3 JSC 3-Energoortalyk
Name Customer Type of project Year Note
121

Development of design and estimate documentation “Reconstruction of connections of 35, 110, 220 kV substations with the replacement of obsolete relay protection and automation equipment with microprocessor protection (terminals), state district power plant of Kazakhmys Energy LLP

Kazenergonaladka Firm LLP

Energy project

2015-2016

The positive conclusion of the Gosexpertiza RSE was received.

122

Development of a project on the topic: "Replacement of the excitation and reconstruction system of relay protection and automation devices of unit No. 5”, Bulat Nurzhanov Ekibastuz GRES-1 LLP

Nur Stroy Pavlodar LLP

Energy project

2015

The facility was commissioned according to the project.

123

Project development for reconstruction of main switchgear-6/10 kV AES Ust-Kamenogorsk TPP LLP

Kazenergonaladka Firm LLP

Energy project

2015

The facility was commissioned according to the project.

124

Development of a working project “Replacement of a car dumper No. 3 of the power plant of Eurasian Energy Corporation JSC

Kazenergonaladka Firm LLP

Technological project

2015

The positive conclusion of the Gosexpertiza RSE was received

125

Development of a project to replace the TRDTsN 63000/110 transformer with TRDN 80 000/110, checking the existing equipment (switching and current-carrying parts, reactors) for their compliance with the changed currents of the short circuit of AES Ust-Kamenogorsk TPP LLP

AES Ust-Kamenogorsk HPP LLP

Energy project

2015

Download reference list