- The Project
- Ekibastuz GRES-1 LLP
- KEGOC JSC
- Bulat Nurzhanov Ekibastuz GRES-1 LLP
- Object: Bulat Nurzhanov Ekibastuz GRES-1 LLP, Facility: Ekibastuz-energoremont LLP
- Vostochnyi open-pit mine Eurasian Energy Corporation JSC
- Eurasian Energy Corporation JSC Power Plant
- Zhezkazgan TPP, Kazakhmys Corporation LLP
- Ekibastuz GRES-2 Station JSC
- Alga A JSC
- Eurasian Energy Corporation JSC PP
- Aktobe HPP JSC
- Eurasian Energy Corporation JSC
- Kazakhmys Smelting LLP, Balkhash, Kazakhstan
- Sary-Arka Spetskoks LLP
- AES Ust-Kamenogorsk HPP LLP
- Karaganda BI Energy Plus LLP
- AES Ust-Kamenogorsk TPP LLP
- AES Shulba Hydroelectric Power Station LLP
- Aksu Ferroalloy Plant – branch of Transnational company Kazchrome JSC
- Firma Partner Plus LLP
- Kazakhmys Energy LLP
- Power plant of Eurasian Energy Corporation JSC
- Energo Spets Stroy LLP
- Aluminum of Kazakhstan JSC
- Nitro Sibir Kazakhstan LLP
- KazTransCom JSC
- TNC Kazchrome JSC
- Don Mining and Processing Plant
- Don Mining and Processing Plant Aktobe Ferroalloy Plant
- Shubarkol Komir JSC
- KAZ Minerals Bozshakol LLP
- KAZ Minerals Bozshakol LLP PAVLODARENERGO JSC
- Don Ore-Dressing Plant - branch of TNC Kazchrome JSC
- Bukhtarma Hydropower Complex
- PP of Eurasian Energy Corporation JSC
- Ust-Kamenogorsk TPP LLP
- HPP of Aluminum of Kazakhstan JSC
- Kazakhstan Aluminium Smelter JSC
- TPP of Aluminum of Kazakhstan JSC
- Pavlodar-Soda LLP
- Atyrau Oil Refinery LLP
- Altyn Group LLP
- TechnoGroupService LLP
- PP Solutions LLP
- Branch of Aluminum of Kazakhstan JSC Krasnooktyabrsk bauxite ore department
- Kaz Green Energy LLP
- Don Ore-Dressing Plant - a branch of TNC Kazchrome JSC
- Ekibastuzteploenergo LLP
- «Vostochny» section of Euro-Asian Energy Corporation JSC
- Pavlodar-Soda LLP
- «Keregetas» mine of «Aluminum of Kazakhstan» JSC
- Krasnooktyabrskoe bauxite ore management of «Aluminum of Kazakhstan» JSC
- STEC-3 «3-Energoortalyk» JSC
- «Zhezkazgan Plant Of Metal Structures» LLP
- Bogatyr Komir LLP
- KSP Steel LLP
- "Aluminum of Kazakhstan" JSC
- Prommashkomplekt LLP
- "Shubarkol Komir" JSC
- ES "Eurasian Energy Corporation" JSC
- Ust-Kamenogorsk CHP LLP
- Copper Company Konrad LLP
- STEC-3 "3-Energoortalyk" JSC
- Technogruppservice LLP
- Ust-Kamenogorsk CHPP LLP
- Zhezkazgan Plant of Metal Structures LLP
- Shymkent Thermal Power Plant-3 JSC "3-Energoortalyk"
- Mine Keregetas, Aluminium of Kazakhstan JSC
- Krasnooktyabrskoye bauxite mining department of Aluminum of Kazakhstan JSC
- Kazakhmys Energy LLP GRES
№ | Name | Customer | Type of project | Year | Note |
126 |
Project development for reconstruction of main switchgear-6/10 kV AES Ust-Kamenogorsk TPP LLP |
Kazenergonaladka Firm LLP |
Energy project |
2015 |
The facility was commissioned according to the project. |
127 |
Development of a working project “Replacement of a car dumper No. 3 of the power plant of Eurasian Energy Corporation JSC |
Kazenergonaladka Firm LLP |
Technological project |
2015 |
The positive conclusion of the Gosexpertiza RSE was received |
128 |
Development of a project to replace the TRDTsN 63000/110 transformer with TRDN 80 000/110, checking the existing equipment (switching and current-carrying parts, reactors) for their complianc |
AES Ust-Kamenogorsk HPP LLP |
Energy project |
2015 |
|
129 |
Development of a project on the topic: "Replacement of the excitation and reconstruction system of relay protection and automation devices of unit No. 5”, Bulat Nurzhanov Ekibastuz GRES-1 LL |
Nur Stroy Pavlodar LLP |
Energy project |
2015 |
The facility was commissioned according to the project. |
130 |
Development of the feasibility study "Construction of the second input of the fuel supply path in the power plant of EEC JSC |
Kazenergonaladka Firm LLP |
Pre-project work |
2015 |
|