- The Project
- Ekibastuz GRES-1
- KEGOC JSC
- Vostochnyi open-pit mine Eurasian Energy Corporation JSC
- ES JSC "Eurasian Energy Corporation"
- Zhezkazgan TPP, Kazakhmys Corporation LLP
- Ekibastuz GRES-2 Station JSC
- Alga A JSC
- Aktobe Ferroalloy Plant – branch of JSC "TNK "Kazchrome"
- Kazakhmys Smelting LLP
- Shubarkol Komir JSC
- Ust-Kamenogorsk CHPP
- Karaganda BI Energy Plus LLP
- Shulbinskaya HPP
- Aksu Ferroalloy Plant – branch of Transnational company Kazchrome JSC
- Prommashkomplekt LLP
- Kazakhmys Energy LLP
- Energo Spets Stroy LLP
- Aluminum of Kazakhstan JSC
- Nitro Sibir Kazakhstan LLP
- KazTransCom JSC
- Don Ore-Dressing Plant - branch of TNC Kazchrome JSC
- KAZ Minerals Bozshakol LLP
- Bukhtarma Hydropower Complex
- Pavlodar-Soda LLP
- Atyrau Oil Refinery LLP
- Altyn Group LLP
- TechnoGroupService LLP
- PP Solutions LLP
- Kaz Green Energy LLP
- Ekibastuzteploenergo LLP
- Pavlodar-Soda LLP
- Keregetas mine of Aluminum of Kazakhstan JSC
- STEC-3 3-Energoortalyk JSC
- Zhezkazgan Plant of Metal Structures LLP
- Bogatyr Komir LLP
- KSP Steel LLP
- Copper Company Konrad LLP
- Technogruppservice LLP
- Shymkent Thermal Power Plant-3 JSC 3-Energoortalyk
№ | Name | Customer | Type of project | Year | Note |
161 |
Development of working documentation for the electrical part of the 35/6 kV substation and 35 kV overhead lines of Ekibastuz GRES-2 Station JSC and cell 6 outdoor switchgear-35 kV of Substation Stroitelnaya- 2, KEGOC JSC |
STROYINDUSTRIYA LLP |
Energy project |
2013 |
|
162 |
Feasibility studies on the transfer of two boilers with a steam capacity of 10 t/h from fuel oil to solid fuel (taking into account the installation of two boilers for solid fuel). |
Alga A JSC |
Pre-project work |
2012 |
|
163 |
Adjustment of design and estimate documentation on reconstruction of dust and gas treatment units in boiler house of Vostochnyi open-pit mine |
Eurasian Energy Corporation JSC |
Technological project |
2012 |
|
164 |
Development of design and estimate documentation Ventilation in general compressor house premises, fuel oil equipment No. 1 and fuel oil equipment No. 2 of Power Station |
Eurasian Energy Corporation JSC |
Technological project |
2012 |
|
165 |
Design work on conditioning, ventilation and heating of the excitation system of power unit No.4 |
Kazenergonaladka Firm LLP |
Technological project |
2012 |
The facility was commissioned according to the project |
