KZ RU EN
48/1 Toraighyrov St, Pavlodar city, Republic of Kazakhstan
KZ RU EN
48/1 Toraighyrov St, Pavlodar city, Republic of Kazakhstan
The Project
  • The Project
  • Ekibastuz GRES-1
  • KEGOC JSC
  • Vostochnyi open-pit mine Eurasian Energy Corporation JSC
  • ES JSC "Eurasian Energy Corporation"
  • Zhezkazgan TPP, Kazakhmys Corporation LLP
  • Ekibastuz GRES-2 Station JSC
  • Alga A JSC
  • Aktobe Ferroalloy Plant – branch of JSC "TNK "Kazchrome"
  • Kazakhmys Smelting LLP
  • Shubarkol Komir JSC
  • Ust-Kamenogorsk CHPP
  • Karaganda BI Energy Plus LLP
  • Shulbinskaya HPP
  • Aksu Ferroalloy Plant – branch of Transnational company Kazchrome JSC
  • Prommashkomplekt LLP
  • Kazakhmys Energy LLP
  • Energo Spets Stroy LLP
  • Aluminum of Kazakhstan JSC
  • Nitro Sibir Kazakhstan LLP
  • KazTransCom JSC
  • Don Ore-Dressing Plant - branch of TNC Kazchrome JSC
  • KAZ Minerals Bozshakol LLP
  • Bukhtarma Hydropower Complex
  • Pavlodar-Soda LLP
  • Atyrau Oil Refinery LLP
  • Altyn Group LLP
  • TechnoGroupService LLP
  • PP Solutions LLP
  • Kaz Green Energy LLP
  • Ekibastuzteploenergo LLP
  • Pavlodar-Soda LLP
  • Keregetas mine of Aluminum of Kazakhstan JSC
  • STEC-3 3-Energoortalyk JSC
  • Zhezkazgan Plant of Metal Structures LLP
  • Bogatyr Komir LLP
  • KSP Steel LLP
  • Copper Company Konrad LLP
  • Technogruppservice LLP
  • Shymkent Thermal Power Plant-3 JSC 3-Energoortalyk
Name Customer Type of project Year Note
166

Development of design and estimate documentation “Replacement of roof coating on healthcare complex of the power plant”

Eurasian Energy Corporation JSC

Architectural and construction project

2012

The facility was commissioned according to the project

167

Reconstruction of fuel and lubricants storehouses of Vostochnyi open-pit mine

Eurasian Energy Corporation JSC

Technological project

2012

The facility was commissioned according to the project

168

Replacement of DC board -4, switchgear -0.4 kV 54I, unilateral-maintenance three-phase distribution assembly for gate valves of assemblies and intermediate cabinets of the power unit st. No.4

Karaganda BI Energy Plus LLP

Energy project

2012

The facility was commissioned according to the project

169

Replacement of DC board -4, switchgear -0.4 kV 54I, unilateral-maintenance three-phase distribution assembly for gate valves of assemblies and intermediate cabinets of the power unit st.No 7

Karaganda BI Energy Plus LLP

Energy project

2012

The facility was commissioned according to the project

170

Designing of switchgear 6/0.4 kV of section 111 NO, 112 NO

Karaganda BI Energy Plus LLP

Energy project

2012

The facility was commissioned according to the project

Download reference list