- The Project
- Ekibastuz GRES-1
- KEGOC JSC
- Vostochnyi open-pit mine Eurasian Energy Corporation JSC
- ES JSC "Eurasian Energy Corporation"
- Zhezkazgan TPP, Kazakhmys Corporation LLP
- Ekibastuz GRES-2 Station JSC
- Alga A JSC
- Aktobe Ferroalloy Plant – branch of JSC "TNK "Kazchrome"
- Kazakhmys Smelting LLP
- Shubarkol Komir JSC
- Ust-Kamenogorsk CHPP
- Karaganda BI Energy Plus LLP
- Shulbinskaya HPP
- Aksu Ferroalloy Plant – branch of Transnational company Kazchrome JSC
- Prommashkomplekt LLP
- Kazakhmys Energy LLP
- Energo Spets Stroy LLP
- Aluminum of Kazakhstan JSC
- Nitro Sibir Kazakhstan LLP
- KazTransCom JSC
- Don Ore-Dressing Plant - branch of TNC Kazchrome JSC
- KAZ Minerals Bozshakol LLP
- Bukhtarma Hydropower Complex
- Pavlodar-Soda LLP
- Atyrau Oil Refinery LLP
- Altyn Group LLP
- TechnoGroupService LLP
- PP Solutions LLP
- Kaz Green Energy LLP
- Ekibastuzteploenergo LLP
- Pavlodar-Soda LLP
- Keregetas mine of Aluminum of Kazakhstan JSC
- STEC-3 3-Energoortalyk JSC
- Zhezkazgan Plant of Metal Structures LLP
- Bogatyr Komir LLP
- KSP Steel LLP
- Copper Company Konrad LLP
- Technogruppservice LLP
- Shymkent Thermal Power Plant-3 JSC 3-Energoortalyk
№ | Name | Customer | Type of project | Year | Note |
166 |
Development of design and estimate documentation “Replacement of roof coating on healthcare complex of the power plant” |
Eurasian Energy Corporation JSC |
Architectural and construction project |
2012 |
The facility was commissioned according to the project |
167 |
Reconstruction of fuel and lubricants storehouses of Vostochnyi open-pit mine |
Eurasian Energy Corporation JSC |
Technological project |
2012 |
The facility was commissioned according to the project |
168 |
Replacement of DC board -4, switchgear -0.4 kV 54I, unilateral-maintenance three-phase distribution assembly for gate valves of assemblies and intermediate cabinets of the power unit st. No.4 |
Karaganda BI Energy Plus LLP |
Energy project |
2012 |
The facility was commissioned according to the project |
169 |
Replacement of DC board -4, switchgear -0.4 kV 54I, unilateral-maintenance three-phase distribution assembly for gate valves of assemblies and intermediate cabinets of the power unit st.No 7 |
Karaganda BI Energy Plus LLP |
Energy project |
2012 |
The facility was commissioned according to the project |
170 |
Designing of switchgear 6/0.4 kV of section 111 NO, 112 NO |
Karaganda BI Energy Plus LLP |
Energy project |
2012 |
The facility was commissioned according to the project |
