- Customer
- Ekibastuz GRES-1 LLP
- Sibtechenergo OJSC
- Ekibastuz-energoremont LLP
- Karaganda BI Energy Plus LLP
- Kazakhmys Corporation LLP
- TekhProject LLP
- Promyshlennaya Gazoochistka Kazakhstana LLP
- Eurasian Energy Corporation JSC
- Karaganda BI Energy LLP
- KAZPROMPRIBOR LLP
- Alga A JSC
- Kazenergonaladka Firm LLP
- Aktobe HPP JSC
- Sary-Arka Spetskoks LLP
- SPACE-MOTOR CJSC
- AES Ust-Kamenogorsk HPP LLP
- STROYINDUSTRIYA LLP
- AES Shulba Hydroelectric Power Station LLP
- Nur Stroy Pavlodar LLP
- Firma Partner Plus LLP
- Energo Spets Stroy LLP
- Aluminum of Kazakhstan JSC
- Nitro Sibir Kazakhstan LLP
- KazTransCom JSC
- Shubarkol Komir JSC
- KAZ Minerals Bozshakol LLP
- SEVKAZENERGOPROM RESEARCH AND PRODUCTION COMPANY LLP
- Kazzinc LLP
- TNC Kazchrome JSC
- Kazpromcontrol LLP
- Pavlodar-Soda LLP
- Energometroservice LLP
- Altyn Group LLP
- TechnoGroupService LLP
- EKRA KAZAKHSTAN LLP
- Kazakhstan Aluminium Smelter JSC
- Atyrau Oil Refinery LLP
- Ust-Kamenogorsk TPP LLP
№ | Name | The objects | Type of project | Year | Note |
41 |
Reconstruction of the premises of warehouse No. 4 of the power plant of EEC JSC |
PP of Eurasian Energy Corporation JSC |
Architectural and construction project |
2017 |
Received a positive conclusion from a comprehensive non-departmental examination. |
42 |
EEC. Replacement of the TM-310 telemechanics complex and GPP-2 mnemonboard with an automated dispatch control system for the plant’s power supply (ASDU) |
Aluminum of Kazakhstan JSC |
Energy project |
2017 |
Received a positive conclusion from a comprehensive non-departmental examination. |
43 |
Verification calculation of the TE-31 pipelines for the strength and self-compensation of temperature expansions, with the issuance of a conclusion about the suitability for further operation |
AES Ust-Kamenogorsk TPP LLP |
Technological project |
2017 |
|
44 |
Reconstruction of the ventilation system and the premises in the building of the REM site of the Electric Shop in accordance with the new standard approved by ERG |
Don Ore-Dressing Plant - branch of TNC Kazchrome JSC |
Technological project/Architectural and construction project |
2017 |
Received a positive conclusion from a comprehensive non-departmental examination. |
45 |
Reconstruction of the ventilation system and premises in the sections of the Electric Shop in accordance with the new standard approved by ERG, Don ODP -branch of TNC Kazchrome JSC |
Don Ore-Dressing Plant - branch of TNC Kazchrome JSC |
Technological project/Architectural and construction project |
2017 |
Received a positive conclusion from a comprehensive non-departmental examination. |