KZ RU EN
48/1 Toraighyrov St, Pavlodar city, Republic of Kazakhstan
KZ RU EN
48/1 Toraighyrov St, Pavlodar city, Republic of Kazakhstan
Customer
  • Customer
  • Ekibastuz GRES-1 LLP
  • Sibtechenergo OJSC
  • Ekibastuz-energoremont LLP
  • Karaganda BI Energy Plus LLP
  • Kazakhmys Corporation LLP
  • TekhProject LLP
  • Promyshlennaya Gazoochistka Kazakhstana LLP
  • Eurasian Energy Corporation JSC
  • Karaganda BI Energy LLP
  • KAZPROMPRIBOR LLP
  • Alga A JSC
  • Kazenergonaladka Firm LLP
  • Aktobe HPP JSC
  • Sary-Arka Spetskoks LLP
  • SPACE-MOTOR CJSC
  • AES Ust-Kamenogorsk HPP LLP
  • STROYINDUSTRIYA LLP
  • AES Shulba Hydroelectric Power Station LLP
  • Nur Stroy Pavlodar LLP
  • Firma Partner Plus LLP
  • Energo Spets Stroy LLP
  • Aluminum of Kazakhstan JSC
  • Nitro Sibir Kazakhstan LLP
  • KazTransCom JSC
  • Shubarkol Komir JSC
  • KAZ Minerals Bozshakol LLP
  • SEVKAZENERGOPROM RESEARCH AND PRODUCTION COMPANY LLP
  • Kazzinc LLP
  • TNC Kazchrome JSC
  • Kazpromcontrol LLP
  • Pavlodar-Soda LLP
  • Energometroservice LLP
  • Altyn Group LLP
  • TechnoGroupService LLP
  • EKRA KAZAKHSTAN LLP
  • Kazakhstan Aluminium Smelter JSC
  • Atyrau Oil Refinery LLP
  • Ust-Kamenogorsk TPP LLP
Name The objects Type of project Year Note
46

Development of working documentation “Replacement of a generator circuit breaker with reference to an existing switchgear RU-13.8kV, Bukhtarma Hydropower Complex

Bukhtarma Hydropower Complex

Energy project/Renewable energy source

2017

47

Implementation of design and estimate documentation for Aluminum of Kazakhstan JSC, Pavlodar Aluminum Plant, Pavlodar. Reactive power compensation device in the power grid.

Aluminum of Kazakhstan JSC

Energy project

2017

Received a positive conclusion from a comprehensive non-departmental examination.

48

Construction of a stationary universal line for technical control of cars and trucks, buses and road trains with an axle load of up to 10 tons

Don Ore-Dressing Plant - branch of TNC Kazchrome JSC

Technological project

2017

Received a positive conclusion from a comprehensive non-departmental examination.

49

The device of the oil receiver, oil drain, foundation and fire wall for the installation of the third transformer 220kV 125 MVA at the substation 220kV

KAZ Minerals Bozshakol LLP

Architectural and construction project

2017

Received a positive conclusion from a comprehensive non-departmental examination.

50

Development of options for the main switchgear scheme in HPP-3 of PAVLODARENERGO JSC regarding optimization of electric power output

KAZ Minerals Bozshakol LLP PAVLODARENERGO JSC

Pre-project work

2017